You don't have javascript enabled. Good luck with that.
Pencarian
43 Sumur Resapan di Wilayah Kembangan Telah di Buat
.
photo Rudi Hermawan - Beritajakarta.id

Kembangan Sub-district Intensified to Make 50 Absorption Wells

To anticipate flooding, as many as 50 absorption wells construction are being intensified in several spots spread across Kembangan Sub-district, West Jakarta.

We're targeting to finish the rest in December

Its construction has been carried out since September. From the 50 wells, there are 43 spots consisting of 32 spots already completed and 11 spots are still in the process of excavation.

"We're targeting to finish the rest in December," expressed Kembangan Sub-district Water Resources Executing Unit Head, Mulyadi, Monday (11/18).

Absorption Well Construction in South Jakarta Intensified

Those 43 spots are spreading across six urban villages, as follows;

1. Srengseng Sawah

- SMPN 207 with five spots

- Srengseng Puskesmas with one spot

- SDN 05 Srengseng with five spots

2. Kembangan Utara

- SDN 01 Kembangan Utara with one spot

- Kembangan Utara Puskesmas with two spots

- MTs Sadam with three spots

3. Meruya Selatan

- SDN 01 Meruya Selatan with two spots

- SDN 06 Meruya Selatan with two spots

- Meruya Selatan II Puskesmas with two spots

- Meruya Selatan I Puskesmas with two spots

4. Joglo

- Joglo I Puskesmas with two spots

- Taufik Mosque with six spots

5. Meruya Utara

- Nusa Indah RPTRA with two spots

- Meruya Utara Puskesmas with one spot

- SDN 12, 13 and 15 Petang with two spots

6. Kembangan Selatan

- Kembangan Selatan Puskesmas with one spot

- SMPN 105 with three spots

"Each well has a maximum depth of three meters with a diameter of 120 centimeters. Officers are deployed to three to four people," he said.

Linked News
Popular News indeks
  1. Five Transjabodetabek Routes will Be Added to Tackle Traffic Congestion

    access_time09-05-2025 remove_red_eye669 personDessy Suciati
  2. Tanah Abang SDA Taskforce Normalizes Channels in Two Locations

    access_time12-05-2025 remove_red_eye459 personFolmer
  3. Munjirin Optimizes Physical and Non-Physical Development in East Jakarta

    access_time08-05-2025 remove_red_eye377 personNurito
  4. Community Work Held to Clean Environment in Petamburan

    access_time11-05-2025 remove_red_eye355 personFolmer
  5. Baduy Tribe Meets Pramono-Rano, Leaves Message of Protecting Nature

    access_time09-05-2025 remove_red_eye296 personDessy Suciati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik